Ferreira Gomes Hydroelectric Power Plant

Treatment in the armed structure to prevent water infiltration, for the Alupar customer. Work carried out in the city of Ferreira Gomes, state of Amapá, Brazil. 252 MW project in August 2019.

UHE São Domingos – Mato Grosso do Sul

We started in May 2016 the activities of Structural Recovery and Waterproofing by injection of Polyurethane Resins at the São Domingos HPP with an installed capacity of 48 MW, owned by Eletrosul / Eletrobras, located between the municipalities of Água Clara and Ribas do Rio Pardo – MS, in the Green River.

PCH Salto Voltão – CEMIG

We performed in May 2016 the filling services of Voids between the shielding and the Suction Concrete of the Generating Unit of Salto Voltão SHP in Xanxerê – SC, owned by CEMIG.

UHE Espora

The Espora Hydroelectric Power Plant is located near the Municipality of Aporé – GO, with an installed capacity of 32 MW. We are performing Containment services of infiltrations with hydroactivated polyurethane resin and repairs to concrete structures.

PCH Serra dos Cavalinhos II – RS

PCH Serra dos Cavalinhos II, with installed capacity of 29MW, built in Rio Grande do Sul. We performed the Waterproofing of Concrete structures by means of Injection of Polyurethane Resins (Foam and Gel), the applied products were of two reputed brands in the market, Sika and MC-Bauchemie being the application executed in its Totality by Rosseti Waterproofing teams.

UHE Passo São João – RS

UHE Passo São João was built in Roque Gonzales – RS, with an installed capacity of 77MW. We performed the Waterproofing of Concrete structures by means of Injection of Polyurethane Resins (Foam and Gel), the applied products were of two reputed brands in the market, Sika and MC-Bauchemie being the application executed in its Totality by Rosseti Waterproofing teams.

UHE Estreito – MA

The Estreito Plant is located in the northern region of Brazil, on the Tocantins River, on the border of the states of Tocantins and Maranhão. The dam and other associated structures are located in the Municipalities of Estreito (MA) and Aguiarnópolis and Palmeiras do Tocantins (TO). With an installed capacity of 1087 MW, it is one of the largest hydroelectric plants operating in the country.

PCH Santa Cruz

PCH Santa Cruz, inaugurated in February 2014, when it started the generation of energy, located in the city of Monte Negro in the state of Rondônia, with an installed capacity of 17 MW.

PCH Jamari

Jamari PCH, inaugurated in May 2014, when it started the generation of energy, located in the state of Rondônia city of Ariquemes, with an installed capacity of 20 MW.

PCH Paratininga II – 2015

With an installed capacity of 29.02 MW, the plant can generate up to 156,000 MWh per year. In February 2008, the Paranatinga II SHP started its operation. We will perform the services of Waterproofing and repair in concrete.

PCH Paratininga II- Primeira Fase 2013

With an installed capacity of 29.02 MW, the plant can generate up to 156,000 MWh per year. In February 2008, the Paranatinga II SHP started its operation.

PCH Buriti – Junho 2015

The PCH Buriti is located between the municipalities of Água Clara and Chapadão do Sul, 390 km from Campo Grande, the capital of Mato Grosso do Sul. It was supplied by the waters of the Sucuriú River. It started operations in February 2007, with an installed capacity of 30 MW.

PCH Buriti – Primeira Fase 2013

A PCH Buriti esta localizada entre os municípios de Água Clara e Chapadão do Sul, a 390 km de Campo Grande, capital do Mato Grosso do Sul. Abastecida pelas águas do rio Sucuriú, Iniciou suas operações em Fevereiro de 2007, com potência instalada de 30 MW.

PCH Canoa Quebrada – Segunda Fase – Junho 2015

The Canoa Quebrada SHP is located on the Rio Verde, on the border of the municipalities of Lucas do Rio Verde and Sorriso, 380 km from Cuiabá (MT). With an installed capacity of 28 MW, it started operations in December 2006.

UHE Salto Osório

Salto Osório Hydroelectric Power Plant is located in the city of São Jorge do Oeste – PR, on the Iguaçu River, with an installed capacity of 1,078 MW.

UHE Salto Santiago

Salto Santiago HPP is located in the city of Saudades do Iguaçu – PR, with an installed capacity of 1,420 MW.

PCH Barra

Repairs, Waterproofing with polymer mortar and resin injection.

UHE Água Vermelha

Injection of acrylic gel, polyurethane, microcement and epoxy resin.

PCH Canoa Quebrada – Primeira Fase – 2014

Repairs in structural elements, waterproofing of surfaces and injection of polyurethane resins.

PCH Garganta da Jararaca – Outubro a Novembro de 2014

The Garganta da Jararaca SHP is located on the River do Sangue, on the border of the municipalities of Campo Novo DO Parecís and Nova Maringá, 450 km from Cuiabá (MT). With an installed capacity of 29.3 MW, it started operations in November 2006.

UHE Tucurui

Injection of Polyurethane Resins, 400 kg of material.

CGH Dona Maria Piana

Injection of waterproofing with application of foam and polyurethane gel. Repairs on degraded concrete.

PCH Pezzi

Injection of waterproofing with application of foam and polyurethane gel. Fill injection with microrecimento.

PCH Toca do tigre

Injection of waterproofing.