We applied Grout Masterflow 9100 – BASF in concrete wind towers, in this case we applied the product in Section 5 of the Steyco project, in Vertical Joints, but performed horizontally, we obtained a good result in the application, where the product behaved in an excellent way, even with low water content reaching the fluidity necessary for the complete filling of the joint and free of retraction.

Ensuring excellent initial and final strengths the product is suitable for horizontal joint applications in concrete towers.

24/02/2017 – São Bento do Norte – RN / Brazil.

#BASF #ConcreteTowers #Grout #Grouting #Masterflow9100 #Wind #WindTowers